The following information should be added to <br />Exhibit E RECLAMATION PLAN <br />1. Introduction <br />The entire 25.0 acre site will be restored for use as high altitude rangeland and wildlife habitat <br />with the exception of a) some access roads will be left and b) some undisturbed areas will not <br />need reclamation. <br />The acreage breakdown is as follows: <br />Total permit = 25.0 acres <br />Undisturbed Area = 2.66 acres <br />Roads to remain = 1.24 acres <br />Area to be reclaimed for worst case = 25.0 - 2.66 ac - 1.24 ac = 21.13 acres. <br />The worst case is the current site condition as of October 2012. The maximum disturbance is <br />already disturbed and the highwalls will need to be reclaimed. As the operation progresses, the <br />current infiltration pond will fill up with fines and this will lessen the amount of backfilling and <br />grading needed for reclamation. <br />Gravel piles that have been through the processing plant will be sold. All portable equipment will <br />be moved off site. The truck scale, vehicles, trailers and all other structures will be removed from <br />the site. Once all structures are removed, the site will be backfilled and graded. Topsoil that exists <br />in current stockpiles will be spread over the entire disturbed area to a depth of 6 inches. The <br />topsoil will then be drill seeded and mulched with mulch from beetle kill trees that have been <br />brought to the Golden Cross property outside the permit area. <br />2. Backfilling and grading: <br />A) Placer Pit: The pit will be limited to a maximum of 20,000 cy for backfilling. <br />B) The Infiltration Pond and highwall will be limited to a maximum of 12,000 cy backfilling. A <br />fill pile of approximately 8,000 cy is located immediately south of the highwall and will be used <br />to backfill the pond with an extremely short downhill dozer push. This pile is seen on Map C -2. <br />C) Other backfilling on site of process ponds and general grading is limited to 16,000 cy. <br />The total backfilling and grading quantity is therefore 48,000 cy. <br />