Laserfiche WebLink
October 30, 2012 C-1981-022/Elk Creek Mine BFB <br /> truck recently sprayed the roads around the mine office and main parking area. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The substation for the methane powered electrical generating station, east of the Elk Creek Fan was <br /> constructed between the existing topsoil pile access road and the hillside (photo 3). The outslopes were well <br /> protected with erosion matting and straw waddles. The substation was built within the disturbance boundary <br /> without a revision to the permit and is the subject of the current infraction(CV-2012-008)listed below. <br /> DOCUMENTS RECEIVED: None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> Infraction Number: CV2012008 <br /> Inspection Date: October 19, 2012 <br /> Date Issued: <br /> Primary Topic: Support Facilities On-site <br /> Secondary Topic: Administrative <br /> Tertiary Topic: <br /> Description: Failure to obtain approval of a revision to the surface coal mining and reclamation <br /> operations prior to implementation. <br /> Abatement 4: 1 <br /> Abatement Due Date: 11/9/2012 <br /> Abatement Description: Submit a revision and a reclamation cost estimate to permit C-1981-022 <br /> to incorporate the electric substation. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 5 <br />