Laserfiche WebLink
STIPULATION NO. 10 <br /> THE DIVISION DIRECTS ENERGY FUELS COAL, INC. TO MONITOR THE <br /> LOCATION AND ORIENTATION OF THE THOMPSON RANCH STRUCTURES . THE <br /> APPLICANT SHALL SURVEY THESE STRUCTURES ON A QUARTERLY BASIS . <br /> Status - Terminated <br /> The revised permit application included a subsidence monitoring <br /> plan that incorporated quarterly monitoring of the Thompson Ranch <br /> structures . This monitoring has been performed in accordance with <br /> the plan to date. No subsidence has been observed since the 1994 . <br /> STIPULATION NO. 11 <br /> THE DIVISION DIRECTS ENERGY FUELS COAL, INC. TO SUBMIT A PROPOSED <br /> REPORT FORMAT FOR THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING <br /> REPORT, WITHIN 180 DAYS FOLLOWING PERMIT APPROVAL. THIS REPORT <br /> FORMAT SHALL INCLUDE TABULATED SURVEY MONUMENT AND STRUCTURE <br /> LOCATION AND ORIENTATION DATA. SURVEY DATA FOR THE TWO <br /> HIGH-RESOLUTION MONUMENT GRIDS SHALL ALSO BE PRESENTED GRAPHICALLY, <br /> IN CROSS-SECTION FORM. THE SUBSIDENCE MONITORING MAP SHALL BE <br /> AMENDED TO INCLUDE MONUMENT IDENTIFICATION LABELING, IN ORDER TO <br /> FACILITATE DATA REPORTING AND ANALYSIS . FINALLY, SEMI-ANNUAL <br /> SUBSIDENCE MONITORING REPORT SHALL INCLUDE A SUMMARY COMPARISON OF <br /> MONITORING RESULTS AND THE APPLICANT' S PREDICTIONS FOR EACH <br /> INVENTORIED STRUCTURE AND THE STREAM CHANNEL OF NEWLIN CREEK. <br /> Status - Terminated <br /> The Division approved a semi-annual subsidence monitoring report <br /> format in conjunction with the first mid-term, Minor Revision 13 , <br /> approved December 10 , 1987 . <br /> STIPULATION NO. 12 <br /> PRIOR TO AFFECTING THE LAND IN THE SOUTHWEST 1/ SECTION 23 , TOWNSHIP <br /> 20 SOUTH, RANGE 70 WEST, THE OPERATOR SHALL SUBMIT RIGHT-OF-ENTRY <br /> INFORMATION FROM THE OWNER. <br /> Southfield Mine Permit Renewal 03 <br /> 6 <br />