My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-14_GENERAL DOCUMENTS - C1981014
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981014
>
2001-06-14_GENERAL DOCUMENTS - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:39:06 PM
Creation date
10/31/2012 10:42:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/14/2001
Doc Name
Proposed Decision and Findings (RN-3)
From
DMG
Permit Index Doc Type
Findings
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODIFYING THE MONITORING PLAN IF NEEDED. THE MONITORING REPORT <br /> SHALL BE ADEQUATE TO PLAN FOR MODIFICATION OF SURFACE OR <br /> UNDERGROUND MINING ACTIVITIES, IF NECESSARY, TO MINIMIZE <br /> DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. THE REPORT IS <br /> DUE AUGUST 1, 1985 . <br /> Status - Terminated <br /> This stipulation was terminated with the approval of Permit Renewal <br /> 01, which incorporated the submittal of an Annual Hydrology Report. <br /> The AHR includes all of the above items into pages 2 . 05 . 6-52 <br /> through 2 . 05 . 6-54 and Exhibit 25 of the permit application. <br /> STIPULATION NO. 8 <br /> THE APPLICANT SHALL SUBMIT A PLAN FOR MONITORING THE SUCCESS OF <br /> REVEGETATION WITHIN 180 DAYS OF PERMIT ISSUANCE. <br /> Status - In Compliance, Terminated <br /> On January 29 , 1985, a plan for monitoring revegetation was <br /> submitted and on February 26, 1985 the plan was accepted. This was <br /> incorporated into the new permit application with the approval of <br /> Permit Renewal 1, November 27 , 1989 . <br /> STIPULATION NO. 9 <br /> THE OPERATOR SHALL POST AND MAINTAIN "STEEP SLOPE CAUTION SIGNS" <br /> ALONG THE ACCESS ROAD TO THE REFUSE DUMP. TWO MONTHS PRIOR TO <br /> ABANDONMENT AND RECLAMATION OF THE ACCESS ROAD, THE OPERATOR SHALL <br /> SUBMIT APPROPRIATE GEOTECHNICAL STABILITY ANALYSIS TO DEMONSTRATE <br /> COMPLIANCE WITH THE STABILITY REQUIREMENTS OF RULES 4 . 03 .2 (3 ) (c) (i) <br /> OR (d) (viii) ; OR IN THE ALTERNATIVE, THE OPERATOR SHALL SUBMIT A <br /> PROPOSED RECLAIMED CONFIGURATION WITH APPROPRIATE STABILITY <br /> ANALYSES TO DEMONSTRATE CONFORMANCE WITH THE REQUIREMENTS OF RULE <br /> 4 . 03 . 2 (7) . <br /> Status - In compliance, Future Submittals <br /> The sign is posted. Stability analyses will be performed prior to <br /> reclamation of the site . <br /> Southfield Mine Permit Renewal 03 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.