Laserfiche WebLink
As stated in the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board <br />for The Extraction Of Construction Materials, Amended August 2006, and C.R.S. 34-32.5 - <br />112(b)(VII) of the Construction Materials Act states the Operator shall provide, "A timetable <br />estimating the periods required for the various stages of the mining operation...the Operator shall <br />not be required to meet the timetable, nor shall the timetable be subject to independent review by <br />the Board or Office. <br />The proposed mining timetable is shown below: <br />YEAR PHASE ONE <br />2013 - 1.5 ACRES PROPOSED FOR MINING <br />2014 - 1.5 ACRES PROPOSED FOR MINING <br />2015 - 1.5 ACRES PROPOSED FOR MINING <br />2016 - 1.5 ACRES PROPOSED FOR MINING <br />2017 - 1.5 ACRES PROPOSED FOR MINING <br />2018 - 1.5 ACRES PROPOSED FOR MINING <br />PHASE TWO <br />2019 - 12.0 ACRES PROPOSED FOR MINING <br />2020 - 12.0 ACRES PROPOSED FOR MINING <br />2021 - 12.0 ACRES PROPOSED FOR MINING <br />2022 - 12.0 ACRES PROPOSED FOR MINING <br />2023 - 12.0 ACRES PROPOSED FOR MINING <br />2024 - 12.0 ACRES PROPOSED FOR MINING <br />2025 - 12.0 ACRES PROPOSED FOR MINING <br />2026 - 12.0 ACRES PROPOSED FOR MINING <br />2027 - 12.0 ACRES PROPOSED FOR MINING <br />2028 - 12.0 ACRES PROPOSED FOR MINING <br />PHASE THREE <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />2029 - 12.5 ACRES PROPOSED FOR MINING <br />YEAR PHASE FOUR <br />