Laserfiche WebLink
Page 6 of 161 <br />BULLDOZER WORK <br />Task description: Backfill and Regrade West Portal Area <br />Site: New Elk Mine Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: <br />Date: 7/12/2011 County: <br />User: JDM <br />Colorado <br />Las Animas <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9R - 9SU (2005) <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: CO 12-002 <br />Total unit Cost/Hour: $207.95 <br />Total Fleet Cost/Hour: $623.85 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,260 <br />Swell factor: 1.125 <br />Loose volume: 14,918 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />200 feet <br />700.0 LCY /hr <br />Drv. non- cohesive 0.8 <br />7,500 feet <br />lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$57.16 <br />NA <br />Operating Cost/Hour: <br />$110.89 <br />100 <br />Ripper op. Cost/Hour: <br />$1.41 <br />20 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $207.95 <br />Total Fleet Cost/Hour: $623.85 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,260 <br />Swell factor: 1.125 <br />Loose volume: 14,918 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />200 feet <br />700.0 LCY /hr <br />Drv. non- cohesive 0.8 <br />7,500 feet <br />lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />0.800 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />CIRCES Cost Estimating Software <br />