Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3123 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />218.61 LCY /hr <br />655.83 LCY /hr <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.951 /LCY <br />Total job time: <br />Total job cost: <br />248.47 Hours <br />$155,010.21 <br />Page 5 of 161 <br />CIRCES Cost Estimating Software <br />