My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2012-10-29_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:54 PM
Creation date
10/29/2012 1:30:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
10/29/2012
Doc Name
Midterm Review Letter & Midterm (MT5)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Permit Index Doc Type
Findings
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Revisions since the last Renewal (Renewal No. 5) Approved March 6, 2009 <br />Revision Number <br />Description <br />Proposed Decision Date <br />MR -89 <br />Add culvert C23a <br />July 8, 2009 <br />MR -90 <br />Add temporary bathhouse trailers <br />February 111 2010 <br />MR -91 <br />Update ownership and control information <br />March 2, 2010 <br />MR -92 <br />Temporary storage of coal waste and <br />development waste <br />Withdrawn March 24, 2010 <br />MR -93 <br />Apache seam slope bottom <br />September 2, 2010 <br />MR -94 <br />Temporary slope facilities <br />August 20, 2010 <br />MR -95 <br />Three slurry return boreholes <br />September 29, 2011 <br />MR -96 <br />Resource confirmation borehole <br />October 4, 2011 <br />MR -97 <br />New RDA conveyors, radial stackers and <br />temporary substation <br />September 30, 2011 <br />MR-98 <br />Add TK Mining Services, LLC as the <br />operator <br />November 21, 2011 <br />MR -99 <br />Geotechnical work located at the proposed <br />RDA #I Expansion Area <br />December 29, 2011 <br />MR -100 <br />Three slurry wells S -1, S -2, and S -3 <br />October 25, 2011 <br />MR -101 <br />RDA conveyor loading point <br />January 5, 2012 <br />MR -102 <br />Relocate 2 slurry return boreholes <br />November 9, 2011 <br />MR -103 <br />Cell repeater installation <br />Withdrawn January 13, 2012 <br />MR -104 <br />Slurry line installation <br />December 30, 2011 <br />MR -105 <br />New structures and geotech. holes <br />January 30, 2012 <br />MR -106 <br />Increase Coal storage at Jansen Yard to <br />24,000 c <br />March 2, 2012 <br />MR -107 <br />Drill 3 resource confirmation holes <br />February 13, 2012 <br />MR -108 <br />Update ownership and control information; <br />NECC as operator <br />March 12, 2012 <br />MR -109 <br />Drill one geotech. hole <br />Withdrawn March 9, 2012 <br />MR -110 <br />Update text, Map 11, Map 12 <br />April 12, 2012 <br />MR -111 <br />Drainage updates, upland diversion Ditch <br />D18 <br />April 26, 2012 <br />MR -112 <br />Expand DWDA footprint by 0.6 acres <br />April 24, 2012 <br />MR -113 <br />Truck loading system and fan <br />April 17, 2012 <br />MR -114 <br />Drill 6 resource confirmation holes <br />May 17, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.