Laserfiche WebLink
permit application. The area described for the loadout is shown on the USGS 7.5 minute Quadrangle <br />map of Trinidad West. <br />Section II: STATUS OF REVISIONS AND STIPULATIONS TO THE PERMIT <br />Permit Revisions since the last Renewal (Renewal No. 5) Approved March 6, 2009 <br />Revision Number <br />Description <br />Proposed Decision Date <br />PR2 <br />Mine plan revision to extract coal <br />August 19, 2011 <br />TR -51 <br />from the Apache and Allen <br />September 18, 2009 <br />TR -52 <br />seams <br />April 27, 2010 <br />PR3 <br />Jansen Coal Loadout <br />February 10. 2011 <br />PR4 <br />Expansion of permit boundary <br />Currently under review <br />TR -55 <br />and mine plan to the east <br />Aril 8, 2011 <br />Permit Transfers since the last Renewal (Renewal No. 5) Approved March 6, 2009 <br />Revision Number Description Proposed Decision Date <br />None <br />Technical Revisions since the last Renewal (Renewal No. 5) Approved March 6, 2009 <br />Revision Number <br />Description <br />Proposed Decision Date <br />TR -50 <br />Incidental boundary change <br />April 15, 2009 <br />TR -51 <br />Increase surface disturbance at West <br />Portal <br />September 18, 2009 <br />TR -52 <br />Temporary development waste storage <br />April 27, 2010 <br />TR -53 <br />New development waste pile (DWDA) <br />January 4, 2011 <br />TR -54 <br />Upgrade site facilities <br />December 27, 2010 <br />TR -55 <br />Bates portals <br />Aril 8, 2011 <br />TR -56 <br />Incidental boundary change and 2011 <br />mine plan <br />May 18, 2011 <br />TR -57 <br />Surface blasting Ian <br />May 11, 2011 <br />TR -58 <br />Blue seam mine plan <br />October 28, 2011 <br />TR -59 <br />Incidental boundary revision, modify <br />structure <br />October 28, 2011 <br />TR -60 <br />Expansion of the DWDA No. 2 <br />February 3, 2012 <br />TR -61 <br />Bathhouse expansion and Pond 7 SAE <br />December 30, 2011 <br />TR -62 <br />Cell repeater installation <br />March 13, 2012 <br />TR -63 <br />Incidental boundary change <br />Withdrawn January 24, 2012 <br />TR -64 <br />Construct 29 ft. diameter ventilation <br />shaft East of facilities <br />Currently under review <br />TR -65 <br />Construct West DWDA No. 3 and <br />sediment drying area <br />August 3, 2012 <br />TR -66 <br />Construct a Haul Road to The RDA <br />August 31, 2012 <br />