Laserfiche WebLink
DATES <br />ACTIVITY <br />STATUS <br />TBD <br />Implementation of new <br />stormwater BMP's <br />Pending (application <br />approval) <br />TBD <br />Construction of portal and <br />mining buildings <br />Pending (active mining) <br />TBD <br />Sealing of mine portal <br />Pending (post mining) <br />TBD <br />Removal of mining <br />facilities <br />Pending (post mining) <br />TBD <br />Site final reclamation <br />(grading, pocking, seeding) <br />Pending (post mining) <br />Table 7: Construction Schedule <br />TBD = dates to be determined <br />(16) Quality Assurance and Quality Control program <br />The design and implementation of the Drainage Design Plan will be overseen by a <br />registered professional engineer. Cotter will conduct regular inspections of all structures, <br />repairing damage and making improvements as needed. <br />(17) Plant Growth Medium (Soils) <br />The surface disturbance at CM -25 occurs primarily in soil types 23, 76 and 88 as marked <br />on the soil map included in this exhibit (See Figure T3). A soil analysis was done on <br />these soil types and is included below on pages T -24 and T -25 of this Exhibit. Cotter will <br />comply with Colorado State University's recommendations as closely as possible. <br />For a full description of soil types as well as a complete report from the Department of <br />Agriculture, Natural Resources Conservation Service, outlining the soils relationship to <br />the local vegetation in the CM -25 Mine, see Exhibit B - Site Description. <br />(18) Wildlife protection <br />In order to minimize or prevent harm or damage to wildlife, Cotter will contact the <br />Colorado Parks and Wildlife (CPW) in order to come to an agreement on acceptable <br />hours of mining operations and to follow other CPW recommendations as closely as <br />possible. A copy of CPW's report can be found in Exhibit B — Site Description. <br />O'Connor Design Group Inc. T - 23 <br />