My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-22_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-07-22_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:25:41 PM
Creation date
10/22/2012 10:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/22/1996
Doc Name
Bid Documents (IMP) 1996 Maintenance Project
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
under the direction of the PROJECT MANAGER as the need arises. Snow removal may be <br /> necessary in order to access some locations. Mud flow (mud slide) materials may need to be <br /> removed to access some locations. Boulders and other debris may need to be removed from the <br /> Dutch Creek flume. Other maintenance activities may be undertaken as the need arises, and as <br /> specified by the PROJECT MANAGER. <br /> The bid will not be awarded over $10,000. <br /> The anticipated performance period is early May, 1996, through mid-June, 1996. Climatic <br /> conditions may dictate modifications of these dates. <br /> Equipment Required (With Operator) <br /> - Caterpillar D-7H or equivalent 215 fhp dozer <br /> - Caterpillar 416B backhoe\loader or 74 fhp equivalent <br /> - Ten (10) cubic yard on\off highway rear dump/haul truck <br /> - Caterpillar 14G Motor Grader or 200 fhp equivalent <br /> The General Bid Specifications, 1996, Section 19.0, Equipment Rental, are applicable to this <br /> Invitation to Bid. A copy of Section 19.0 is attached. <br /> Machine time is NOT guaranteed, however, if a particular piece of equipment is used, it will be <br /> used for a minimum of eight (8) hours. Equipment bid costs for the first eight (8) hours [Column <br /> E) shall include a cost of mobilizing and demobilizing the piece of equipment to and from the site. <br /> Any time above 8 hours for a single mobilization event will be paid at the rate bid for additional <br /> hours [Column G]. CONTRACTOR will be used on an "on call" basis, and must be available at <br /> the site with the specified equipment by 9:00 a.m. the morning following notification by the <br /> PROJECT MANAGER. <br /> Silt Fence <br /> The CONTRACTOR will supply the prefabricated silt fence with posts (Mirafi Prefabricated Silt <br /> Fence with Posts having a 2 foot width and 3 feet between posts, or equivalent) or straw bales and <br /> rebar as needed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.