Laserfiche WebLink
APR 10 '96 03:40PM DIV/MINERALS&GEOLOGY P.2i10 <br /> Bid Award <br /> The apparent low bidder must sign and submit the attached Bid Schedule, and a certificate of <br /> insurance with the following limits: <br /> 1. Standard Workers Compensation and Employer Liability, as required by State Statute including <br /> occupational disease, covering all employees at the work site. <br /> 2. General liability (Public Liability and Property Damage) (Minimum): <br /> a. Combined single limit of $600,000 written on an occurrence basis; <br /> b. Any aggregate will not be less than $1 million; <br /> c. The CONTRACTOR must purchase additional insurance if claims reduce the annual <br /> aggregate below $600,000; <br /> d. The State of Colorado must be named as additional insured on each comprehensive general <br /> liability policy; <br /> e. Certificates of insurance must be provided to the state within ten 0 0) working days after <br /> receipt of award; and, <br /> f. insurance shall include provisions providing notification to the State ten (10) days prior to <br /> cancellation of the coverage. <br /> 3. Automobile Liability (Minimum). The CONTRACTOR must carry a minimum of $600,000 <br /> combine single limit. <br /> Project Work Description <br /> The purpose of the project is to perform maintenance at the mine site during snowmelt runoff. <br /> Maintenance activities which may be conducted include removal of snow, snow slide or landslide <br /> materials from roads, ditches or streams; removal of debris from culvert entries at stream <br /> crossings, maintenance of roadside ditches and culverts, and maintenance of the Dutch Creek <br /> flume. Silt fence or straw bales may be placed at various locations around the mine site to <br /> minimize sediment transportation. <br /> Work will involve removing debris from ditches, culverts, and streams under the direction of the <br /> PROJECT MANAGER. This work may occur along roadside ditches and culverts and at stream <br /> crossings. An aggregate of one hundred feet (100') of sediment containment fences (prefabricated <br /> silt fences with posts, to be installed as per manufacturer specifications, or hay bales anchored by <br /> two (2) four feet (41 lengths of 3/8 inch rebar per bale) may be constructed at various locations <br /> under the direction of the PROJECT MANAGER as the need arises. Snow removal may be <br /> necessary in order to access some locations. Mud flow (mud slide) materials may need to be <br /> removed to access some locations. Boulders and other debris may need to be removed from the <br /> Dutch Creek flume, Other maintenance activities may be undertaken as the need arises, and as <br /> specified by the PROJECT MANAGER. <br /> The anticipated performance period is early May, 1996, through mid-June, 1996. Climatic <br /> Conditions may dictate modification of these dates. <br /> 2 <br />