My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (191)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (191)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:03:19 AM
Creation date
10/22/2012 10:31:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Legal Notice
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
toward middle of road (6' deep by 18' long cut at 3H: 1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 6 feet depth at 3H:1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> 30+000 Remove 30 inch culvert (50 feet in length, <br /> buried 4 feet at outlet end) . Construct 80 feet long 8 feet wide <br /> low water crossing. Tie in to channel below existing culvert. Rip <br /> rap channel using rock with median diameter (D 50) of 10 inches. <br /> 30+000 to 31+000 Cut 5 vertical feet from outslope at 3H:1V <br /> toward middle of road (5' deep by 15' long cut at 3H: 1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 5 feet depth at 3H: 1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> 31+000 to 33+100 Cut 4 vertical feet from outslope at 3H:1V <br /> toward middle of road (4' deep by 12' long cut at 3H: 1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 4 feet depth at 3H:1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> 33+100 Remove 24 inch culvert (100 feet in length, <br /> buried 8 feet at outlet end) . Construct 110 feet long 8 feet wide <br /> low water crossing. Rip rap crossing using rock with a median <br /> diameter (D 50) of 10 inches. Place 10 yards of 24 inch to 36 inch <br /> rip rap into channel below culvert outlet locations. <br /> 33+100 to 34 +000 Flatten road surface by cutting 2 feet deep by <br /> 10 feet wide from outslope, and fill inslope ditch. Rip remnant <br /> road surface to 8 inches, and seed entire road width. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> 34+000 to 35+000 Cut 5 vertical feet from outslope at 3H:1V <br /> toward middle of road (5' deep by 15' long cut at 3H:1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 5 feet depth at 3H:1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> 35+000 to 36+000 Cut 4 vertical feet from outslope at 3H:1V <br /> toward middle of road (4' deep by 12' long cut at 3H: 1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 4 feet depth at 3H: 1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br /> C:\wp51\rdfrc <br />
The URL can be used to link to this page
Your browser does not support the video tag.