My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (191)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (191)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:03:19 AM
Creation date
10/22/2012 10:31:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Legal Notice
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation plan for Road F --Number 3 Mine haul road <br /> Stations are on a 200 feet separation. Station 0+000 is located at <br /> the intersection of Roads G, F and E. <br /> 0+000 to 6+000 Road segment is generally cut into Mancos Shale <br /> outcrop, with outcrop exposed in road bed. Outslopes and inslopes <br /> are very steep and consist of outcrop or mancos talus slopes. <br /> Flatten road bed by grading material bermed on the outside edge of <br /> the road (1 foot tall by 3 feet wide avg. ) into inside ditch. Rip <br /> road bed as possible. build cutout trenches every 100 feet. <br /> Trenches should be excavated into the road bed perpendicular to the <br /> road to a depth of 4 feet, 20 feet wide at the invert, with side <br /> slopes not exceeding 5H:1V. Excavated material should be placed <br /> and compacted on the down gradient lip of the trench. Outslopes <br /> will be hydroseeded. <br /> 6+000 Build cutout as per 0+000 specifications. <br /> 6+000 to 9+128 Grade road flat, construct cutouts at 100 feet <br /> intervals. See 0+000 specifications. <br /> 9+128 Build cutout as per 0+000 specifications. <br /> 9+128 to 10+150 Grade road flat, construct cutouts at 100 feet <br /> intervals. See 0+000 specifications. <br /> 10+150 to 11+150 Cut 3 vertical feet from outslope at 3H: 1V <br /> toward middle of road (3' deep by 10' long cut at 3H: 1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 3 feet depth at 3H: 1V slope. Rip remaining road- bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 100 feet intervals, as per 0+000 specifications. <br /> 11+150 to 12+100 Cut 4 vertical feet from outslope at 3H:1V <br /> toward middle of road (4' deep by 12' long cut at 3H:1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 4 feet depth at 3H: 1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 100 feet intervals, as per 0+000 specifications. <br /> 12+100 to 13+150 Grade road flat, construct cutouts at 200 feet <br /> intervals. See 0+000 specifications. <br /> 13+150 to 15 +000 Cut 5 vertical feet from outslope at 3H:1V <br /> toward middle of road (5' deep by 15' long cut at 3H:1V slope <br /> toward middle of road) . Place cut material against inslope of the <br /> road at 5 feet depth at 3H: 1V slope. Rip remaining road bed to 8 <br /> inches. Seed entire road width, including cut slope. Construct <br /> cutouts at 200 feet intervals, as per 0+000 specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.