Laserfiche WebLink
compacted at up-slope lip by dozer. <br /> 3+80 Excavate four feet of material from outside <br /> point in the road and backfill to four feet against <br /> the outcrop, continuing up the road about 20 feet <br /> (backfill extends from 3+80 uphill to 3+60) . <br /> 3+80 to 4+80 Slope to outside. Same treatment as 0+00 notes <br /> 4+80 to 8+00 Slope to outside. Same treatment as 0+00 <br /> M notes. Install cut outs every 100 feet. See 2+10 <br /> notes for dimensions <br /> 8+00 Cut nose off outslope to backfill on inslope at <br /> old road junction. estimate quantity of cut and <br /> fill material at 46 cubic yards. <br /> 8+00 to 12+00 Cut outslope berm and additional 2 feet from <br /> inslope and place against inslope, grade bench to <br /> outslope. see 2+00 task. place cutouts every 100 <br /> feet. See 2+10 description. <br /> 12+00 to 14+00 Begin cut from inside of road toward outside, <br /> spoiling material over bench, continuing cut from <br /> inslope toward outslope through 12+80 (grading will <br /> cut off drainage through old inslope ditch at head <br /> of bend) . cut sufficient material from outslope of <br /> bend beginning at 13+10 through 13+85 to fill <br /> inslope of bend beginning at point opposite 13+45. <br /> blend cut and fill with material spoiled by cut and <br /> fill operations at 12+00 to 12+80. Grade fill at <br /> ND 13+85 to flatten at 14+00 . total amount of cut and <br /> / I fill estimated at cubic yards. <br /> 14+00 to 16+00 Install cut out ditches at 14+00 and 15+75, See <br /> 2+00 notes for specifications. leave road grade as <br /> is. <br /> 16+00 to 18+00 Cut fill material on outside of bend (17+40) <br /> and fill inside of bend to create a flat gradient <br /> through bend in road. Create cut out from 17+25 <br /> toward 18+00. See 2+10 for specifications. <br /> 18+00 to 21+50 Flatten road surface, fill inside gully in <br /> process. Install cut outs per 2+10 specification <br /> every 100 feet. <br /> 21+50 to 23+50 Cut down outside berm, fill inside ditch, grade <br /> road to outslope. Cut of 2 vertical feet below berm <br /> to achieve outslope drainage. <br /> 23+50 to 24+00 Cut outslope of road about 2 feet, fill inslope <br /> of road, grade to achieve drainage to outslope. <br />