My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (191)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (191)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:03:19 AM
Creation date
10/22/2012 10:31:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Legal Notice
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> �ec r> <br /> Mine 5 fan bench reclamation plan <br /> At bench install drainage divide on bench west side to direct <br /> water toward exploration road <br /> 2. Exploration road: rip seed mulch segment <br /> Ci4 . Gently grade the bench toward large gully <br /> a�� 4. Rock in the large gully to minimize continued erosion <br /> '� c ev c n /t-)L <br /> o 5. Push dirt to top of gully to create lip to slow and retain <br /> water ' tg"` T4--(t <br /> 6. Spread a veneer of soil-like material on the bench th E' <br /> 7. Seed bench by drilling, blow mulch and seed down gully <br /> '"-(C -f d- <br /> Road to access strip mine and post law power poles <br /> 1. Create depression in road to stop flow down road (15 wide, 4 <br /> deep) 40 feet from bottom. <br /> 2 . Create berm at junction of road and bench to direct water from <br /> road to bench — ( g �13 6 _ _._ �g <br /> J <br /> 3 . Rip, seed, mulch tn-)- <br /> S�a<rc <br /> Td .�-Fr ,<- <br /> Number 5 mine fan road <br /> Stations on 100 feet, beginning at junction of road to strip mine <br /> and fan access road. <br /> 0+00 to 2+00 Slope to outside cut 2 feet from outslope of <br /> road, fill 2 feet on inslope. Slope gradient formed <br /> by filling inslope and cutting outslope and <br /> intermediate grading must exceed road surface <br /> gradient. <br /> 2+00 to 3+80 Same as 0+00; see 0+00 and 2+10 notes <br /> L 2+10 Create rolling dip: cut with dozer blade a <br /> '\ depression which is about 20 feet wide at crest and <br /> four feet deep at center. excavated dirt is <br />
The URL can be used to link to this page
Your browser does not support the video tag.