Laserfiche WebLink
y <br /> STATE, OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> DATE: June 18, 1996 RESOURCES <br /> Roy Romer <br /> TO: All Bidders on the Coal Basin Road Reclamation Project Governor <br /> James S Lochhead <br /> Executive Director <br /> FROM: Steve Renner, Project Manager Michael B Long <br /> Division Director <br /> RE: Amendment Number 1 to PKA-6-376 <br /> Thank you for attending the pre-bid meeting on June 17, 1996. My telephone number is (970) <br /> 241-0336. Map 4, Earth Work and Map 5,Hydrologic Structures, were distributed at the Pre-Bid <br /> Meeting and should be incorporated into the bid document. <br /> A copy of the sign in sheet is attached. The Forest Service has provided the attached list of <br /> sources for certified weed free mulch. <br /> The following amendments and clarifications should be incorporated into the Invitation for Bid: <br /> 1 . The purpose of the Additive Alternate for backfilling the Mine 3 Fan Road is to allow the <br /> Division the opportunity to compare costs in order to determine the manner in which to <br /> reclaim this road segment. Tasks 3 and 4 require that parts of the road be graded to a <br /> 0% slope, and that parts be graded to a 1 % slope; that 15 rolled dips be constructed and <br /> that the road be ripped and revegetated. The bid price of the Additive Alternate should <br /> take into account the cost to backfill the road to the specifications outlined on page 14 <br /> of the Invitation to Bid, minus the savings of not accomplishing the grading and ripping <br /> or construction of the rolled dips outlined in Tasks 3 and 4. Fill material will be excavated <br /> from below the road in the quantity necessary to achieve the configuration specified in <br /> the Additive Alternate. <br /> The lowest responsible bid will be determined using the procedure outlined under Additive <br /> Alternates on page 3 of the Special Conditions. The alternate shall be added to the base <br /> bid of each bidder within funds available to finance the contract for the purposes of <br /> determining the lowest responsible bidder. The use of the alternate will be at the sole <br /> discretion of the State. Contractors are required to submit a bid bond for the amount of <br /> their base bid only. <br /> 2. Please note that the project is scheduled to begin on July 22, 1996, and will end on <br /> September 27, 1996. The time of completion for the project is sixty seven (67) days, <br /> including ten (10) days mobilization time after receipt of the Notice to Proceed. <br />