Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> PROJECT OVERVIEW <br /> The goal of this project is to reclaim the entry areas, fans and associated disturbances at <br /> Mines 1 and 2. Mines 1 and 2 are located south of Mine 3 and north of Mine 4. Mines 1 and <br /> 2 drain to Dutch Creek via tributaries of both the North and South Forks. These mines are <br /> approximately 4.3 miles from the main entry gate, and are accessed via Road D (Map 3, Coal <br /> Basin Mine Map). <br /> This project will accomplish reclamation of the Mines 1 and 2 areas and associated <br /> disturbances through the demolition and disposal of concrete foundations, the excavation of <br /> material from bench outslopes and backfilling against adjacent highwalls and cut slopes. <br /> Surface drainages will be constructed at various locations. All cut and fill areas, bench <br /> remnants, conveyor corridor and bench outslopes will be revegetated. <br /> Volumes, distances and areas stated in this document are estimations only. CONTRACTORS <br /> are responsible for verifying all estimations prior to bid submittal. <br /> WORK TASKS <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fence Installation <br /> Task 4: Earth Work <br /> Task 5: Surface Drainage: Furrows <br /> Task 6: Surface Drainage: Rolling Dips <br /> Task 7: Surface Drainage: Cut Out Trenches <br /> Task 8: Equipment Rental <br /> Task 9: Revegetation <br /> Task 10: Additional Furrow Construction <br /> Task 1 1 : Additional Rolling Dip Construction <br /> Task 12: Additional Cut-Out Trench Construction <br /> Task 13: Additional Silt Fence Installation <br /> 6 <br />