My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (192)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (192)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:04:11 AM
Creation date
10/22/2012 10:29:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br /> PROJECT OVERVIEW <br /> The goal of this project is to reclaim the entry areas, fans and associated disturbances at <br /> Mines 1 and 2. Mines 1 and 2 are located south of Mine 3 and north of Mine 4. Mines 1 and <br /> 2 drain to Dutch Creek via tributaries of both the North and South Forks. These mines are <br /> approximately 4.3 miles from the main entry gate, and are accessed via Road D (Map 3, Coal <br /> Basin Mine Map). <br /> This project will accomplish reclamation of the Mines 1 and 2 areas and associated <br /> disturbances through the demolition and disposal of concrete foundations, the excavation of <br /> material from bench outslopes and backfilling against adjacent highwalls and cut slopes. <br /> Surface drainages will be constructed at various locations. All cut and fill areas, bench <br /> remnants, conveyor corridor and bench outslopes will be revegetated. <br /> Volumes, distances and areas stated in this document are estimations only. CONTRACTORS <br /> are responsible for verifying all estimations prior to bid submittal. <br /> WORK TASKS <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fence Installation <br /> Task 4: Earth Work <br /> Task 5: Surface Drainage: Furrows <br /> Task 6: Surface Drainage: Rolling Dips <br /> Task 7: Surface Drainage: Cut Out Trenches <br /> Task 8: Equipment Rental <br /> Task 9: Revegetation <br /> Task 10: Additional Furrow Construction <br /> Task 1 1 : Additional Rolling Dip Construction <br /> Task 12: Additional Cut-Out Trench Construction <br /> Task 13: Additional Silt Fence Installation <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.