Laserfiche WebLink
TASK 12 ADDITIONAL CUT-OUT TRENCHES <br /> Additional cut out trenches may be constructed on the roads in the construction area. up to <br /> 100 additional linear feet of cut out trenches may be constructed. These additional cut out <br /> trenches will be located in the field by the PROJECT MANAGER. Any cut out trenches built <br /> under Task 12 will conform to the design specifications of Task 7 Surface Drainage; Cut Out <br /> Trenches. The construction of additional Cut Out Trenches is NOT guaranteed. <br /> Measurement and Payment <br /> Payment for additional Cut Out Trenches constructed will be per cut out trench installed. <br /> Payment for this task will be at prices established in Item 12 of the Invitation and Bid Sheet <br /> per cut out trench installed. Such Payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and incidental to the furnishing and <br /> placement of the cut out trenches as directed and described in the specifications. Payment <br /> will be as this Task is completed and approved by the PROJECT MANAGER. Payment for this <br /> Task will be made only for the unit prices shown under Item 12 of the Bid Schedule. <br /> TASK 13 ADDITIONAL SILT FENCE <br /> Additional silt fence may be erected at various locations at the construction areas. Up to <br /> 2,000 additional feet of silt fence may be installed. The location of additional silt fences will <br /> be marked in the field by the PROJECT MANAGER. Silt fencing materials must conform to <br /> the specifications contained in Task 3, Silt Fence. The installation of additional silt fence is <br /> NOT guaranteed. <br /> Measurement and Payment <br /> Payment for additional silt fence installation will be per linear foot installed. Payment for this <br /> task will be at prices established in Item 13 of the Invitation and Bid Sheet. Such Payment <br /> shall be considered full compensation for all labor, materials, equipment and all other items <br /> necessary and incidental to the furnishing and installation of additional silt fence as directed <br /> and described in the specifications. Payment will be as this Task is completed and approved <br /> by the PROJECT MANAGER. Payment for this Task will be made only for the unit prices <br /> shown under Item 13 of the Bid Schedule. <br /> 26 <br />