My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (192)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (192)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:04:11 AM
Creation date
10/22/2012 10:29:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The remaining bench remnant shall be graded to ensure that water drains away from the base <br /> of the fill area. Two (2) contour furrows will be constructed on the bench remnant to contain <br /> runoff in order to help prevent sediment transport. These furrows are described, and will be <br /> constructed and paid for, under Task 5, Surface Drainage: Contour Furrows. <br /> Upon completion of backfilling, grading and drainage construction, the bench remnant shall <br /> be ripped to a depth of eighteen (18) inches. <br /> Measurement and Payment <br /> There will be no measurement for payment for excavation, placement of backfill materials, <br /> grading, ripping and culvert removal. Payment for these portions of Task 4 will be reflected <br /> under Item 4 on the Bid Schedule. This bid will cover all costs for excavation and placement <br /> of the bench outslope materials, placement and compaction of the fill at the base of the <br /> highwalls and cuts, final grading of the benches and cut and fill area outslopes, road grading <br /> operations, road berm removal, culvert removal or decommissioning and ripping operations. <br /> Payment shall be as this task is completed and approved by the PROJECT MANAGER. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.