My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-28_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-05-28_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 4:13:36 PM
Creation date
10/22/2012 10:28:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/28/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volumes, distances and areas stated in this document are estimations only. Contractors are <br /> responsible for verifying all estimations prior to bid submittal. <br /> Safety <br /> It is the responsibility of the CONTRACTOR to ensure a safe working environment within the tunnel <br /> entries during fulfillment of this contract. Therefore, CONTRACTOR shall monitor the atmosphere <br /> within each entry during performance of the work, and provide for ventilation as needed. A multi- <br /> gas meter supplied by the CONTRACTOR must be used to test air before and during installation of <br /> the pipe, block walls and backfill within the mine entries. This requirement shall also apply when <br /> the existing block walls are perforated. The roof and ribs shall be stabilized as necessary to ensure <br /> safe working conditions. <br /> CONTRACTOR shall provide evidence of safe working conditions to the satisfaction of PROJECT <br /> MANAGER prior to starting work within the entries. <br /> Work Tasks <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fence Installation <br /> Task 4: Block Wall <br /> Task 5: Earth Work <br /> Task 6: Surface Drainage: Rock Tunnel Discharge <br /> Task 7: Surface Drainage: Contour Furrows <br /> Task 8: Equipment Rental <br /> Task 9: Revegetation <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.