Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 204 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: _ <br />Total one-way travel distance: _ <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable Roadable <br />Equipment Equipment <br />1.43 1.43 <br />1.43 1.43 <br />0.50 NA <br />0.50 NA <br />3.86 2.86 <br />Page 2 of 2 <br />MONTE VISTA <br />50.00 miles <br />35.00 mph <br />$1,865.31 <br />$0.00 <br />Total job time: 7.71 Hours <br />Total job cost: $1,865.31 <br />Note: Only the D9 Dozer is included, since other equipment is already part of the bond. <br />CIRCES Cost Estimating Software <br />