Laserfiche WebLink
Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Haul additional reclamation equipment to and from site <br />Site: Equity Exploration Project Permit Action: MD -2 Pennit/dob#: P2011010 <br />PROJECT IDENTIFICATION <br />Task #: 204 State: Colorado <br />Date: 10/18/2012 County: Mineral <br />User: RCO <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: P010-204 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />Weight/ <br />Owner ship <br />Haul Rig <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />Return Trip <br />DOT Permit <br />Description <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Cost/hr/unit <br />Size <br />Costlhr/ <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />eratin Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Costlhr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D9T - 9SU <br />65.36 <br />$81.85 <br />$125.45 <br />1 <br />$207.30 <br />$125.45 <br />$250.00 <br />Subtotals: $207.30 1 $125.45 1 $250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cosvbr/ fleet <br />Subtotals: $0.00 $0.00 <br />CIRCES Cost Estimating Software <br />