3. Pocking of the waste embankment according to the plan described in Exhibit E Pocks will be installed <br />by a track hoe on the slope. It is estimated that the track hoe will require 3 full days at 7 hours per day at <br />an hourly cost of $150. The cost for this task is $150 per hour x 7 hours per day x 3 days = $3,150. <br />4. All surface facilities will be removed. <br />Lower Mine Area This includes the following at the Lower Mine area: shop, warehouse, office and dry <br />facility building with its concrete foundation. Fuel tanks are provided by the fuel supply contractor, and <br />will be removed by the contractor at no cost to the operator. The building dimensions are 40 ft wide x <br />73 feet long x 15 feet tall. The building sits on a 4 inch concrete slab which totals 36 cubic yards. The <br />building can be dismantled and removed from the site for $12,000 and the concrete foundation can be <br />removed for $12,240. Cost components are: <br />a) Shop, warehouse, office, dry building removal = $12,000. <br />b) Concrete foundation removal 36 cy x $340 /cy = $12,240. <br />Upper Mine Area The Upper Mine Area will require the removal of the small water treatment <br />building and its foundation, the new pond fences, the power box and poles /transformer, piping <br />and man hoist and building. Cost components are: <br />a) Water treatment building and minor foundation = $4,000. <br />b) Pond fences (cyclone fence w /8' high wooden posts) = $1,000. <br />c) Power box and poles /transformer (usually done by the power company) = $3,000 <br />d) Piping from borehole to treatment building and ponds and water discharge piping = $2,000 <br />The total facility removal cost = $34,240. <br />5. The liners and precipitates will be excavated with a track hoe and taken by truck to a licensed disposal <br />facility Based on Cotter's past experience at other sites and based on the size of the old ponds, this <br />would amount to 6 trucks of 24 ton capacity. The worst case scenario will be based on a track hoe <br />working for 10 hours to excavate the liners and precipitate at an hourly cost of $130 per hour loading 6 <br />trucks. The trucking cost to the mill is a known independent cost of $850 per truck. The cost for this <br />task is $130 per hour x 10 hours + $850 per truck x 6 trucks = $6,400. <br />L -2 <br />