PHASE <br />TIME (in months) <br />Sealing of adits, shafts, ventholes, etc. <br />Within 12 months of <br />finalizing mining <br />operations <br />Removal of surface buildings <br />Same as above. <br />Cap remaining undisturbed waste embankment with <br />available soil material <br />2.0 <br />Remove precipitate sludge from treated water ponds <br />and take to mill /place liners in mine workings <br />1.0 <br />Remove clay pad from ore pad area and store in <br />mine <br />0.5 <br />Re- contour waste area and treatment ponds <br />6 <br />Rip compacted areas of JD -9 prior to topsoil <br />replacement <br />0.2 <br />Replace topsoil on remaining areas of JD -9 Mine <br />0.4 <br />Pock and seed JD -9 area and block access <br />0.2 <br />Backfill sediment pond, collection ponds and <br />ditches <br />1.5 <br />Re- vegetation where applicable <br />2 -3 years <br />Total Months <br />59.8 <br />Total Years <br />5 <br />Table E -1 Final Reclamation Timetable <br />Surface Disturbances: <br />A. Mine portal <br />B. Mine yard <br />C. Mining buildings /trailers <br />D. Haulage ramps <br />E. Ventilation shafts <br />F. Berms and ponds <br />G. Utilities <br />H. Waste rock pile <br />I. Ore stockpile <br />J. Treatment ponds and sludge <br />For a list of acreages associated with each surface disturbance see Exhibit D — Mining <br />Plan. <br />A. Mine Portal <br />The JD -9 Mine will not require the installation of a bulkhead seal. The amount of <br />water inflow into JD -9 is insignificant. Ventholes connecting the mine workings <br />to the surface will be sealed, reducing the water inflow even more. Additionally, <br />the low point of the mine is located within the workings over 2500 feet <br />E -2 <br />