Laserfiche WebLink
TASK DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> 6 Low Water <br /> Crossing,Main <br /> Sutey Road 1 Each $1,133.33 $1,133 <br /> 7 Surface <br /> Channels <br /> a Sutey Ditch 8 s 900 Feet $10 $9,000 <br /> b Old Refuse Pile, <br /> Main 6 5,000 Feet $6.83 $34,150 <br /> c Apply Soil,Old <br /> Refuse Pile Main <br /> Channel " 1,852 Cubic Yards $3.26 $6,038 <br /> d Old Refuse Pile, <br /> Upper Channel 850 Feet $2.65 $2,253 <br /> 12 <br /> e Old Refuse Pile, <br /> Vwer Channel 600 Feet $2.65 $1,590 <br /> 8 Earth Work, <br /> Grading <br /> a Belt Line <br /> Transfer Pad <br /> (AOC) 40 s Hours $78 $3,120 <br /> b 9 Yard Area 24 Hours $80 $1,920 <br /> c Old Coal Storage 32 Hours $80 $2,560 <br /> d South of Prep. <br /> Plant Hill 8 Hours $80 $640 <br /> 9 Earth Work,Rip <br /> a Yard Area 7 17 Acres $147 $2,499 <br /> b Old Coal Storage 2 Acres $147 $294 <br /> 10 Topsoil <br /> Application <br /> a Upper Sutey <br /> Access Road " 1,028 Cubic Yards $2.54 $2,611 <br /> b Lower Sutey <br /> Access Road 10 1,056 Cubic Yards $2.54 $2,682 <br /> c Transfer Station <br /> Road 250 Cubic Yards $3.26 $815 <br />