Laserfiche WebLink
Facilities Area Project (Old Refuse Pile drainage, Facilities area final reclamation, Sutey Pile <br /> access roads) <br /> TASK DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> 1 Mob/Demob 1 Job N/A $13,310 <br /> 2 Demolition 13 <br /> a Steel and Debris, <br /> Main Gate, <br /> Wash Plant <br /> Vicinity 1 Job N/A $2,000 <br /> b Power Poles, <br /> Prep.Plant to <br /> Lamp House 1 Job N/A $9,100 <br /> c Office Water <br /> Tower 1 Job N/A $562 <br /> d Steel Building, <br /> Wash plant <br /> Vicinity- 1 Job N/A $3,390 <br /> 3 Road Grading <br /> a Old Refuse Pile <br /> Road " 5,200 Feet $0.74 $3,848 <br /> b Upper Sutey <br /> Access(AOC) 1,850 Feet $5.65 $10,453 <br /> c Lower Sutey <br /> Access(AOC) 1,900 Feet $5.65 $10,735 <br /> d NW Sutey <br /> Access 300 Feet $0.74 $222 <br /> e Beltline Transfer <br /> Road 450 Feet $5.65 $2,543 <br /> 4 Culvert <br /> Removal, Sutey <br /> Access Road 5 Each $257.84 $1,289 <br /> 5 Rolled Dip <br /> Construction <br /> a Sutey NW Road 2 Each $72.67 $145 <br /> 2 <br /> b Old Refuse Pile <br /> Road 21 Each $72.67 $1,526 <br /> c Main Sutey <br /> Road 3 10 Each $363.33 $3,633 <br />