Laserfiche WebLink
02/18/94 11:08 U505 7662609 OSM ALBU9 FO LO 010 <br /> Rock Tunnel OSM DMG <br /> Refuse Area <br /> Quantity Cost Unit Cost Quantity Cost Unit Cost <br /> 1. Down Drain (yd2) <br /> (a) Excavation 56. 277. 4.95 <br /> (b) Ripmp 28. 3,083. 110.11 <br /> 2. Removal of 32,267. 64,533. 2.00 12,320. 4,189. 0.34 <br /> Combustible Material <br /> (yds3) <br /> 3. Terracing (yds3) <br /> (a) Excavation 2,444. 9,167, 3.75 <br /> (b) Ripmp 0. 0. <br /> 4_ Diversion <br /> (100yr.-24hr) (yds3) <br /> (a) Fxcavation 4,444. 16,667. 3.75 <br /> (b) Riprap 444. 54,000. 121.62 <br /> 5. Reclaim Clear Water 1,852. 13,519. 7.30 <br /> Diversion (yds) <br /> 6. Material Placement 83,876. 167,752. 2.00 25,016.* <br /> (yds') (4 feet 9 13 ac) <br /> 7. Revegetation (ac) 13. 12,025. 925. <br /> Summary $341,023. <br /> * Includes revegetation, finish grade, and topsoil. Cost estimate from DOGM's conceptual Coal Basin reclamation <br /> schedule. Does not include material placement of 4 feet. <br />