Laserfiche WebLink
02/18/94 11:07 '0505 7662609 OSM ALBUA FO ig 009 <br /> OSM DMG <br /> Portal # 5 <br /> Quantity Cost unit Cost Quantity Cost unit Cost <br /> 1. Facility & Structure 0. 4,124. <br /> Removal <br /> 2. Earthmoving (yds3) 314.667. 319,437. 1.02 36,138. 12,287. 0.34 <br /> (Backming & Grading <br /> of Portal Bench and <br /> Highwall) <br /> 3. Haulroads <br /> (a) Backfilling & <br /> Grading (yds) <br /> (1) Road A (1/5) 25,062. 14,733. 0.59 1,050. 4,102. 3.�1 <br /> (2) Road E (1/2) 85,034. 199,592. 2.35 3,468. 13,548. 3.91 <br /> (3) Road G 464,587. 1,044,829. 2.25 15,426. 60,270. <br /> (b) Structure Removal <br /> (1) Road A (1/5) 750. <br /> (2) Road E (1/2) 1.118. <br /> (3) Road G 8,569. <br /> 4. Revegetation (ac) <br /> (a) Portal Bench 5.8 25,311. 4,364_ 7.3 16,261; 2,230. <br /> (b) Haulroads <br /> (1) Road A (1/5) 2.9 2,682. 4,364. <br /> (2) Road E (1/2) 7.1 30,984. 4,364. <br /> (3) Road G 45.2 197,252. 4,364, <br /> 5. Archaeology 2,WO- <br /> Evaluation <br /> 6. Diversion for Overland <br /> Flow (yds3) <br /> (a) Excavation 1,389. 5,208. 3.75 <br /> (b) Riprap 278. 33,750. 121.40 <br /> 7. Coal removal from <br /> Creek (yds') <br /> (a) Excavation 10,278• 26,928• 2.62 <br /> (b) Riprap 685. 67,148. 98.03 <br /> Summary $1,980�91. <br />