Laserfiche WebLink
02/18/94 11:07 IMU5 76UZUUV UJM ALHUW rV Lfi!JUUI <br /> OSM DMG <br /> Portal # 3 <br /> Quantity Cost Unit Cost Quantity Cost Unit Cost <br /> 1. Facility & Structure 79,322. 38,410. <br /> Removal <br /> 2. Eatthmovmg 524,876. 1,133,873. 2.16] 553,333. 17,873. 0.34 <br /> (Backfilling & <br /> Grading of Portal <br /> Bench and HighwaW <br /> 3_ Haulroads <br /> (a) Backfilling & <br /> Grading (yds3) <br /> (1) Road A (115) 25,062. 14,733. 0.59 1,050_ 4,102. 3.�1 <br /> (2) Road E (112) 85,034. 199,592. 2.35 3,469. 13,548. 3.91 <br /> (3) Road F 387,645. 1,090,794. 2..81 12,120. 47,353. 3.91 <br /> (b) Structure Removal <br /> (1) Road A (115) 750. <br /> (2) Road E (1/2) 1,118. <br /> (3) Road F 4,327. <br /> 4. Revegetation <br /> (a) Portal Bench (ae) 3.7 16,146. 4,364. 4.7 10,483. 2,230. <br /> (b) Haulroads <br /> (1) Road A (115) 2.9 2,682. 925. <br /> (2) Road E (1/2) 7.1 30,984. 4,364. <br /> (3) Road F 30.7 133,974. 4,364. <br /> Summary S 2,708,285. <br />