Laserfiche WebLink
02/18/94 11:06 p505 765ZUUV UbM ALtsud ru C000 <br /> pSM DMG <br /> Portal # 2 <br /> Quantity Cost Unit Cost Quantity Cost Unit Cost <br /> 1. Facility & Structure 52,604. 26,014. <br /> Removal <br /> 2. Eartlunoving (yds3) 117,037. 230,814. 1.97 3,330. 1.116. 0.34 <br /> (Backfilling & <br /> Grading of Portal <br /> Bench and Highwall) <br /> 3. Haulmads <br /> (a) Backfilling & <br /> Grading (yds3) <br /> (1) Road A (1/5) 25,062. 14,733. 0.59 1 1,050. 4,102. 3.91 <br /> (2) Road B (1/3) 25,333. 46,229_ 1.83 1,253. 4,896. 3.91 <br /> (3) Road D (1/2) 148,442. 382,683. 2.58 6,709. 26,210. 3.91 <br /> (b) Structure Removal <br /> (1) Road A (1/5) 750. <br /> (2) Road B (1/3) 385_ <br /> (3) Road D (1/2) 990. <br /> 4. Revegetation (ac) <br /> (a) Portal Bench 3.8 16,583. 4,364. 4.8 10,654. 2,230. <br /> (b) Haulroads <br /> (1) Road A (1/5) 2.9 2,682. 925. <br /> (2) Road B (1/3) 2.9 2,682. 925. <br /> (3) Road D (1/2) 12.85 54,574. 4,247. <br /> Summary j $805,709. <br />