Laserfiche WebLink
Road Reclamation(grading only,excludes Huntsman Ridge Road,Light Use Roads) <br /> Lewicki <br /> $46,671 <br /> Division of Minerals and Geology <br /> $32,736 <br /> Backfill Rock Tunnel to Prep Plant <br /> Lewicki <br /> $16,653 <br /> Division of Minerals and Geology <br /> No estimate,work previously completed <br /> Rough Grade Site <br /> Lewicki <br /> $98.6 ac @ $30,498 <br /> Division of Minerals and Geology <br /> Included in various projects <br /> Light Use Road Reclamation(to AOC)(excludes Sutey NW,Main Sutey,Old Refuse Pile) <br /> Lewicki <br /> $4,498 <br /> Division of Minerals and Geology <br /> $23,731 <br /> Contractor Overhead and Profit.Division admin costs <br /> Lewicki <br /> $120,354 <br /> Division of Minerals and Geology <br /> $0 <br /> Lewicki Total $641,593 <br /> Left Out Of Lewicki Estimate <br /> Road cut and fill slope Revegetation <br /> 27 steep slope acres <br /> Power pole demo,prep plant to lamp house <br /> Sediment pond reclamation <br /> Huntsman Ridge Road Reclamation <br /> Reclaimed roads drainage control <br /> Pond access roads reclamation <br /> Main Sutey access road <br /> North west Sutey access road reclamation <br /> Main Sutey access road drainage control <br /> Sutey Ditch 8 reconstruction <br /> Old Refuse Pile access road reclamation <br /> Old Refuse Pile drainage control <br /> Mine Maintenance <br />