Laserfiche WebLink
Comparison Lewicki estimate 9-97,and Division estimate, 1-98 <br /> Revegetation <br /> Lewicki <br /> 5 steep slope ac. @ $3,345=$16,725 <br /> 113.6 ac. @ $5999=$68,046 <br /> Division of Minerals and Geology <br /> 32 ac.steep slopes @ $2,280=$72,960 <br /> 23 ac.Road cut and fill @ $1,140=$26,220 <br /> 75 ac. @ $1,072 =$80,400 <br /> 44 ac. @ $1,097=$48,268 <br /> Concrete demolition(assume prep plant and lamp house vic.only) <br /> Lewicki <br /> $146,019 <br /> Division of Minerals and Geology <br /> $102,000 spent at prep plant <br /> 29,309 estimated to be done at lamp house <br /> Prep Plant Backfill(assume includes placement of coal refuse and dirt cover) <br /> Lewicki <br /> $142,149 <br /> Division of Minerals and Geology <br /> $3,200 Refuse placed by Huntsman Project—AML funded <br /> Finish Grade <br /> Lewicki <br /> 98.6 ac @$10,000 <br /> Division of Minerals and Geology <br /> Included in other tasks <br /> Sediment pond removal <br /> Lewicki <br /> $0 <br /> Division of Minerals and Geology <br /> $78,128 <br /> Topsoil <br /> Lewicki <br /> $35,000 <br /> Division of Minerals and Geology <br /> $46,718 <br /> Mobilization/demobilization <br /> Lewicki <br /> $5,000 <br /> Division of Minerals and Geology <br /> $62,790(excluding Loadout,demolition) <br />