Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br /> P. MISCELLANEOUS RECLAMATION TASKS <br /> Task #1 Task Description Cost (E) <br /> __----I--------------------------------------------------- _---_-____ <br /> N/A Mine #5 archaeological investigation (deleted) <br /> 232 Line Old Refuse pile ditches $13,680 <br /> 235 Line Sutey ditches $3,648 <br /> 233 Install Sutey downdrain $5,049 <br /> 230 Line Rock Tunnel dewatering ditch $2,390 <br /> 241 Rill and gully repair after reclamation (40hrs/10yrl $17,080 <br /> 242 Road maintenance after reclamation (20hrs/10yrs) $17,154 <br /> 243 Clean ponds during vegetation establishment $192,000 <br /> N/A Clear/Grub topsoil borrow areas <br /> 234 Line Sutey diversion $16,416 <br /> 236 Construct low water crossings on roads $94,605 <br /> 237 Construct rolling dips on roads $68,835 <br /> 238 Construct drop structures on roads $6,400 <br /> 260 Mobilize equipment for Roads A and B $4,074 <br /> 261 Mobilize equipment for Carbondale Loadout $2,985 <br /> 262 Mobilize equipment for site maintenance $3,764 <br /> ------------------------------------_-------------------__-_-----_-_--_- <br /> Subtotal (P): $448,079 <br /> sheet 9 of 10 <br />