My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (184)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (184)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:50:25 AM
Creation date
10/19/2012 10:20:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�C14- C <br /> RECLAMATION COST SUMMARY cont'd <br /> M. REVEGETATION AND RESEEDING <br /> Task #1 Task Description Cost (S) <br /> »_.,__..I-----_M-------------------------_..--------------__ _________- <br /> 140 Revegetate areas to be drill seeded $109,437 <br /> 141 Revegetate areas to be broadcast seeded $191,578 <br /> 142 Revegetate areas to be hydroseeded $276,472 <br /> ----------------------------___--_.-----------____—_____..___________-_ <br /> Subtotal (M): $577,488 <br /> N. STRUCTURAL DEMOLITION & REMOVAL <br /> Task #1 Task Description Cost ($) <br /> ______I--------_..----_----_..-------------_--------------- ------------ <br /> 50 Remove all structures on site $1,229,590 <br /> N/A 7% contingency fee for structural demolition $86,071 <br /> 50a Mine #3 and #5 demolition/corrections to previous $211,615 <br /> estimate <br /> ___-________—_______________________________________..___________.._-____ <br /> Subtotal (N): $1,527,276 <br /> 0. EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> Task #1 Task Description Cost ($) <br /> I--- ----------_-------------_--------------------- ------------ <br /> 160 Mobilize equipment for Sutey, Rock Tunnel, Old Reful $4,903 <br /> 161 Mobilize equipment for Road G and Mine #5 $5,563 <br /> 162 Mobilize equipment for Road F and Mine #3 $5,563 <br /> 163 Mobilize equipment for Mines #1 and #2 $3,143 <br /> 164 Mobilize equipment for Road D hydro, lower #1/#2 bel $5,563 <br /> 165 Mob. for Road C hydro, Mine #4 and lower benches $5,563 <br /> 166 Mob. for Roads C, D, E, F, and G $4,074 <br /> 167 Mob. for Rock Tunnel $3,183 <br /> 168 Mob. for Prep Plant and Shop $6,007 <br /> 169 Mob. for pond removal and Dutch Creek diversion $2,507 <br /> __.....____________.._______________________________________________________ <br /> Subtotal (0): $46,068 <br /> sheet 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.