Laserfiche WebLink
�C14- C <br /> RECLAMATION COST SUMMARY cont'd <br /> M. REVEGETATION AND RESEEDING <br /> Task #1 Task Description Cost (S) <br /> »_.,__..I-----_M-------------------------_..--------------__ _________- <br /> 140 Revegetate areas to be drill seeded $109,437 <br /> 141 Revegetate areas to be broadcast seeded $191,578 <br /> 142 Revegetate areas to be hydroseeded $276,472 <br /> ----------------------------___--_.-----------____—_____..___________-_ <br /> Subtotal (M): $577,488 <br /> N. STRUCTURAL DEMOLITION & REMOVAL <br /> Task #1 Task Description Cost ($) <br /> ______I--------_..----_----_..-------------_--------------- ------------ <br /> 50 Remove all structures on site $1,229,590 <br /> N/A 7% contingency fee for structural demolition $86,071 <br /> 50a Mine #3 and #5 demolition/corrections to previous $211,615 <br /> estimate <br /> ___-________—_______________________________________..___________.._-____ <br /> Subtotal (N): $1,527,276 <br /> 0. EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> Task #1 Task Description Cost ($) <br /> I--- ----------_-------------_--------------------- ------------ <br /> 160 Mobilize equipment for Sutey, Rock Tunnel, Old Reful $4,903 <br /> 161 Mobilize equipment for Road G and Mine #5 $5,563 <br /> 162 Mobilize equipment for Road F and Mine #3 $5,563 <br /> 163 Mobilize equipment for Mines #1 and #2 $3,143 <br /> 164 Mobilize equipment for Road D hydro, lower #1/#2 bel $5,563 <br /> 165 Mob. for Road C hydro, Mine #4 and lower benches $5,563 <br /> 166 Mob. for Roads C, D, E, F, and G $4,074 <br /> 167 Mob. for Rock Tunnel $3,183 <br /> 168 Mob. for Prep Plant and Shop $6,007 <br /> 169 Mob. for pond removal and Dutch Creek diversion $2,507 <br /> __.....____________.._______________________________________________________ <br /> Subtotal (0): $46,068 <br /> sheet 8 of 10 <br />