Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - HYDRAULIC EXCAVATOR WORK <br /> Task #: 36 Prep. by: SLB Task File Name: C017-36 <br /> Dater 031;/94 Permit #:C-81-017 Mine: Coal Basin Mines-_- ---____---- .. ---_..-----_..---------------- <br /> Pennit Action: N/A <br /> Task Description: Reduce Road G to Post Mine Width <br /> HOURLY EQUIPMENT COST <br /> --------------------- <br /> --------------------- <br /> Basic Machine: CAT 245B (1990) Shift Basis:l/day <br /> Cost Breakdown: <br /> -------------- Utilization % Horsepower 360 <br /> Ownership cost/hr = $77.58 N/A ---------- <br /> Operating & overhaul cost/hr= $64.96 100 Weight-tons: 0.00 <br /> Operator cost/hr = $21.76 N/A ________-_ <br /> -------- (DQI W) <br /> Total egpt. unit cost/hr = $164.31 Total fleet cost/hr: S164.31 <br /> _-----__--- <br /> MATERIAL QUANTITIES <br /> ------------------- <br /> ------------------- <br /> Initial Swell Loose <br /> Volume: 7,259.0 BCY Factor: 1.25 Volume: 9,073.8 cu. yds. <br /> ----------- --------- ------------- <br /> Source of quantity take-off: Division Estimate <br /> ------------------------------------------------- <br /> Source of est. swell factor: Division Estimate <br /> _-__-_______.,,..-------------------------------------- <br /> HOURLY PRODUCTION <br /> ----------------- <br /> ----------------- <br /> Cycle Time - Basic cycle time vs. job condition rating: SEVERE <br /> ---------- - Time value within basic rating: MAXIMUM <br /> Basic cycle time = 0.83 min. <br /> Bucket Capacity ------------- <br /> Rated capacity: 2.50 LCY (heaped) Size class: small <br /> Bucket fill factor: 0.68 USER-PROVIDED BUCKET FILL FACTOR <br /> Adjusted capacity: 1.70 LCY <br /> Job Condition Correction Factors - Altitude adj. = 1.00 (C/H 16s) <br /> ---------------------------- - Job efficiency = 0.83 (1 s/d Yl1A) <br /> Site altitude = 10,000 ft. ----------- <br /> ------- Net correction 0.83 <br /> Unadjusted hourly unit production : 122.45 LCY/Hr <br /> Adjusted hourly unit production : 101.63 LCY/Hr <br /> Adjusted hourly fleet production : 101.63 LCY/Hr <br /> JOB COST <br /> Fleet Size: 1 Excavator(s) Total Job Time: 89.28 Hours <br /> Unit Cost : $1.617 /cu. yd. Total Job Cost: $14,669.16 <br /> ------- ----------- <br />