Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - HYDRAULIC EXCAVATOR WORK <br /> Task #: 35 Prep. by: SLB Task File Name: C017-35 <br /> ---..._--- ------------- <br /> Date: 03/ 4 Permit #:C-81-017 Mine: Coal Basin Mines <br /> 3 !4 1 <br /> '5 Permit Action: N/A <br /> ......................................................... <br /> Task Description: Reduce Road F to Post Mine Width <br /> HOURLY EQUIPMENT COST <br /> --------------------- <br /> --------------------- <br /> Basic Machine: CAT 245B (1990) Shift Basis:l/day <br /> CostBreakdown: ------------------- ---------- <br /> Utilization % Horsepower : 360 <br /> Ownership cost/hr = $77.58 N/A ---------- <br /> Operating & overhaul cost/hr= $64.96 100 Weight-tons: 0.00 <br /> Operator cost/hr = $21.76 N/A ---------- <br /> -------- (DOI W) <br /> Total eqpt. unit cost/hr = $164.31 Total fleet cost/hr: $164.31 <br /> MATERIAL QUANTITIES <br /> ------------------- <br /> ------------------- <br /> Initial Swell Loose <br /> Volume: 13,183.5 BCY Factor: 1.25 Volume: 16,479.4 cu. yds. <br /> ----------- __________ ------------- <br /> Source of quantity takeoff: Division Estimate <br /> --------------------------------------------.-._______ <br /> Source of est. swell factor: Division Estimate <br /> -------_------------------------------------------ <br /> HOURLY PRODUCTION <br /> ----------------- <br /> ----------------- <br /> Cycle Time - Basic cycle time vs. job condition rating: SEVERE <br /> --------- - Time value within basic rating: MAXIMUM <br /> Basic cycle time = 0.83 min. <br /> Bucket Capacity ------------- <br /> ---------- --- <br /> Rated capacity: 2.50 LCY (heaped) Size class: small <br /> Bucket fill factor: 0.68 USER-PROVIDED BUCKET FILL FACTOR <br /> ------- ------------------------------_-_-_--------------- <br /> Adjusted capacity: 1.70 LCY <br /> Job Condition Correction Factors - Altitude adj. = 1.00 (C/H I6 ) <br /> _---------..._—____------------ - Job efficiency = 0.83 (1 s/d YUA) <br /> Site altitude = 10,000 ft. ----------- <br /> ------- Net correction 0.83 <br /> Unadjusted hourly unit production 122.45 LCY/Hr <br /> Adjusted hourly unit production 101.63 LCY/Hr <br /> Adjusted hourly fleet production 101.63 LCY/Hr <br /> JOB COST <br /> Fleet Size: 1 Excavator(s) Total Job Time: 162.15 Hours <br /> Unit Cost : $1.617 /cu. yd. Total Job Cost: $26,641.53 <br /> ------- ----------- <br />