Laserfiche WebLink
Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Rip (173) 471 715 <br /> Grade ( 5 AC) (135) 319 319 <br /> Hydro Control n,,,S , 7--c e s <br /> Topsoil (252) 20,939 <br /> Reveg. ( 3 & 7) (140 and 141) 10,941 20,452 <br /> IN,rr Grade Conveyor Line (248) 243 <br /> �f Fan Seal (Done) (51) 2,524 4,627 <br /> Backfill Entry (6) 372 744 <br /> Backfill and Compact Bench 1,795 822 <br /> (177, 202, 209) <br /> Concrete Removal (50a) 1,036 <br /> Rip bench (216) 663 <br /> Berm & Ditches - incl. in #4 incl. Mine #4 <br /> mine <br /> Grade - incl. in #4 mine incl. Mine #4 <br /> Hydro Control <br /> Reveg. - incl. in #4 mine incl. Mine #4 <br /> � 14�— <br />