Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est, <br /> Hydro Control <br /> 'Reveg. (3 + 3) (140 and 141) 6,028 11,207 <br /> Road D Hydro Control - Low Water 32,469 <br /> Crossings, Rolling Dips, Drop <br /> Structures (236, 237, and 238) <br /> Mob/Demob (Mines 1 & 2, 8,706 <br /> Road) (163 and 164) <br /> Job Superintendent (263) 23,001 <br /> Mine 4 Seal (Done) (51) 2,524 18,508 <br /> All Acreages Backfill Entry (5) 1,853 1,489 <br /> Estimated <br /> Backfill Bench (181) 12,187 20,473 <br /> Backfill Bench (207) 8,594 <br /> Compact bench fill (214) 1,760 <br /> Concrete Removal (50) 29,205 30,042 <br /> Berms & Ditches (175) 6,181 415 <br /> 13 <br />