4. Objection by i'lid-Continent to the recommendations may be filed within
<br /> 30 days of receipt by laid-Continent. Such objection shall be made in writing
<br /> to the Division. Such disagreements will be settled between the Division/USFS
<br /> and Mid-Continent, or may be subject to administrative and judicial review.
<br /> E . Final Reclamation Schedule
<br /> 1 . If the permit is not transferred to a successor permittee or the mine
<br /> is not otherwise reactivated, Mid-Continent shall initiate and complete
<br /> reclamation of the �"oal 3asi n i'li nes and the Carbondale 1 oadout site in
<br /> compliance with the following schedule:
<br /> a. January 13 , 1992
<br /> Mid-Continent will report to the Division as to its plan, including a
<br /> sIlGwiily satisfactory to %iic Division of -its Capability to prGCrcu
<br /> with final reclamation of the mine property commencing June 1 , 1992.
<br /> b . ilav , 1992 - October, 1992
<br /> iiiitidt2 and COr�71ct2 rciidmdtiJr Vf 'line i , 2 , 3 , 4 , and CJ portal
<br /> areas , including portal sealing. structural demolition, backfillinq
<br /> 111 -s . ompl Ct:2 :,C!31 4^y cf the uu; rCC': tunnel . nCC1 3f^a tl V,_ mv'St
<br /> commence no later than June 1 , 1992.
<br /> C. May, 1993 - ,0c"ober, 1,991)
<br /> Complete reclamation of the adit/rock tunnel area, initiate and
<br /> compiere reclamation or the prepararion plant area, refuse areas,
<br /> rnir1c , and r:nnv,�vor ` i,: iac Re,-1.3mation will entail farilitie-,
<br /> demolition, backfilling and grading, topsoiling, and revegetation.
<br /> Roads will 5e d�c�rini;;i7r,��d ;.1ch t`!at the post-mine land use
<br /> obiectives will be serve!. Tn,, roar± surfaces and cut and fill slopes
<br /> W'.11 �e �t.'.0:'. i :_ -: '_ ..� , �_�+ :�1 -aintenance
<br /> drainage control s, stt_ will installed in place of the current
<br /> nigh maintenance sy3,-2 ,.
<br /> d— May , 1994 - Ci tober, 'n`.�,'.
<br /> Initi,:te and c3mplet�? of —4e Carbondale mail Loadout.
<br /> Perform any necessar., r p.3ir; , '^.3int?nance or follow-up work as
<br /> required at the :oat 3.3sin mine site.
<br /> e. October, 1,994 until =inil Bond Release
<br /> Perform necessary dr•ainag,, and sediment pond maintenance,
<br /> environmental monitoring and oterwise maintain the site in
<br /> compliance wit.i all appl icabl-3 statutes , regulations and permit
<br /> conditions until final bond release.