My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-10-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:35 PM
Creation date
10/18/2012 3:29:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/17/2012
Doc Name
CQA REPORT 10/13/2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,A p-ayq <br />r`"I AMv° ameO <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: October 13, 2012 <br />Reporting Period: 10/7/2012 through 10/13/2012 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />- <br />N <br />N <br />N <br />- <br />- <br />D = Day Shift <br />N = <br />Night Shift <br />Project No.: 74201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day /Night <br />17 <br />Ambient Temperature Range ( °F): Low: 17 °F to 36 °F ( + / -) High: 42 °F to 57 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />Ames: Work activities were paused at approximately 3:OOpm Friday October 12, 2012 due to fog and <br />saturated work surfaces. Work activities will resume Monday October 15, 2012. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Subgrade Preparation <br />Subgrade preparation was performed preparing for soil liner fill placement. Moisture conditioning <br />of the subgrade was performed (when necessary) using a tandem -axle water truck. Compaction <br />was performed using a 10 -ton vibratory smooth drum compactor passing over the entire subgrade <br />surface at least four times. The subgrade shown on Figure 2 was inspected and approved by an <br />AMEC field representative for SLF placement. <br />B) Overburden Fill Placement <br />A CAT 988 front -end loader was used to excavate overburden fill material from a borrow area <br />designated by CC &V. The material was loaded into CAT 40 -ton articulating haul trucks. The fill <br />excavation was assisted by various CAT dozers. <br />Overburden fill was placed in the areas shown on Figure 1. DCF depth was checked by survey <br />and the area was approved prior to placement. Overburden fill was placed in 36" to 40" lifts using <br />various CAT dozers. Each lift was moisture conditioned using a tandem axle water truck (when <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />Subgrade temperatures were monitored by an AMEC field representative prior to fill placement <br />when ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area <br />was at or above 32 °F. Fill material placed during ambient temperatures below 32 °F averaged <br />41 °F to 45 °F. <br />MEW Weekly Report WE 10. 13.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.