Laserfiche WebLink
RWI � �` <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />SEP 30 <br />OCT 1 <br />OCT 2 <br />OCT 3 <br />OCT 4 <br />OCT 5 <br />OCT 6 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Bill Erickson <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Ben Melly <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Alyssa Wagner <br />- <br />GT <br />GT <br />GT <br />- <br />- <br />- <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />PCE <br />- <br />- <br />- <br />*Night Shift <br />1=Nd011w, <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 10.06.2012 <br />