My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-10-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:35 PM
Creation date
10/18/2012 3:29:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/17/2012
Doc Name
CQA REPORT 10/6/2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Samples Obtained <br />DCF — 1 <br />SLF -2 <br />Testing Performed <br />SLF Moisture /Density — 21 <br />SLF Depth Checks — 15 <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF .placement. <br />Continue subgrade acceptance prior to geomembrane deployment. <br />Continue anchor trench excavation. <br />Continue geomembrane installation. <br />Continue anchor trench backfill. <br />Continue geomembrane acceptance prior to DCF placement. <br />Continue Overburden Fill placement. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V; <br />CC &V held a weekly construction meeting on October 2, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Jay Moore (AMEC Certifying Engineer) was onsite on Wednesday, October 3, 2012 to observe project <br />activities, progress, and discuss schedule. <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represents o <br />October 6, 2012. <br />Joseph Hickey, CQA Mon for <br />Approv d By: <br />/C f-5/Z a <br />ndings and observations for the week ending <br />Date: October 6, 2012 <br />Date: <br />MEW Weekly Report WE 10.06.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.