Laserfiche WebLink
12. List the seed mixture to be used in the re- establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS /acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM/USFS if <br />on public land or State Land Board if on state land. <br />A. Provide plant name and seeding rate <br />7 (FORM 2 - Public filing) <br />Plant Name <br />See attached sheet (Popovich) <br />Seeding Rate (PLS /acre) <br />B. Describe the method for seed bed preparation, and application method for grass /forb seeding: <br />Topsoil will be spread loosely over affected areas to a depth of 2 ". Seed mix will be <br />broadcast over topsoil on flat areas to be reclaimed. Slopes that will require <br />reclamation will be stabilized with biodegradable matting with fertilizer and seed mix <br />. . • - . . . - - T T 111... .. ...0 T T <br />- - 1 - - . -4 <br />and securcd to each clopc. Erosion controls will be used inaccordance with <br />accepted practices. <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />3. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre - <br />prospecting condition; <br />B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream channel. Drill cuttings must be spread to a depth no greater than one -half (1/2) inch or buried in an approved <br />disposal pit; <br />