My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-18_PERMIT FILE - P2012012
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012012
>
2012-10-18_PERMIT FILE - P2012012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:37 PM
Creation date
10/18/2012 3:20:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012012
IBM Index Class Name
PERMIT FILE
Doc Date
10/18/2012
Doc Name
RESPONSE
From
SANTIAGO MINING
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No topsoil exists in the areas of anticipated disturbance. Part of the level 5 dump has <br />been capped with riprap (unmineralized granite). Adequate topsoil will be spread to an <br />average depth of z" per Nopovich) over the disturbed areas once reclamation can begin. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />No drilling will be conducted during this permitted time. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No adits will be opened under this NOI. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />• . • ... . • - . .. • • - • _ • • . - . - • - .. _ . _ . - • - a ' • . . • <br />Future mining may require the use of this road if underground mining is resumed. The <br />road to the 4th level will also be maintained at 10'. The main road to the mine will be <br />graded as the operating budget allows, and snow plowing may be done to extend the <br />WUIMmy b dbUii. <br />
The URL can be used to link to this page
Your browser does not support the video tag.