Laserfiche WebLink
TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with the attached specification 1.0, Mobilization/Demobilization. <br /> Mobilization <br /> This task includes moving equipment and supplies to the project area. If desired, the <br /> CONTRACTOR may establish a staging area for the storage of all equipment and supplies. <br /> The area shall be of adequate size to accommodate all of the CONTRACTOR'S vehicles, <br /> equipment and supplies and shall minimize impact on the staging area with regard to noise, <br /> dust and fumes. The CONTRACTOR shall be responsible for maintaining security of the <br /> staging area. <br /> This task also includes all labor and costs associated with locating and protecting utilities, <br /> both above ground and underground at the work site. <br /> Demobilization <br /> This item shall include all labor, equipment and costs associated with demobilization and <br /> clean-up of the work site to its original or better condition. All equipment, supplies, <br /> materials and debris related to this project will be removed from the site upon completion. <br /> The CONTRACTOR will also reclaim any staging area or other ground disturbed during <br /> the course of the project located outside of the project area as defined by this Bid <br /> Document. All haul roads shall be fully regraded and reclaimed upon completion of the <br /> project. <br /> Measurement and Payment <br /> There will be no measurement for payment for this bid item. Payment shall be made as <br /> specified in 1.0, Mobilization/Demobilization, attached. <br /> TASK la REMOBILIZATION <br /> This task is not guaranteed and will be required only if winter weather conditions preclude <br /> completion of the project during the 1994 calendar year. this task includes all labor and <br /> costs associated with temporarily withdrawing from the project until weather and <br /> construction conditions permit restarting the project in calendar year 1995 and all labor and <br /> costs associated with recommencing reclamation activities. Withdrawal activities include <br /> installation of any temporary structures necessary to stabilize the site until reclamation <br /> activities resume. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task la. Payment for remobilization will <br /> be made for the lump sum price shown under Item la on the Bid Schedule. <br /> 5 <br />