PROJECT WORK DESCRIPTION <br /> The Coal Basin/Sutey Pile Permit Revocation Project includes the following tasks: <br /> Task 1: Mobilization/Demobilization <br /> Task 2: Surface Drainages <br /> Task 3: Earthwork <br /> Task 4: Revegetation <br /> Task 5: Equipment Rental <br /> Measurement and payment for TASK 3 will be based on successfully completing the <br /> required performance objectives. It is the CONTRACTOR'S responsibility to confirm the <br /> described conditions and calculations. The OWNER recommends and encourages <br /> CONTRACTORS to compare the existing conditions with the maps and perform their own <br /> calculations. <br /> The CONTRACTOR shall exercise caution during mobilization, performance of all work <br /> tasks and demobilization in order to avoid damage to all public or private property <br /> including, but not limited to, pavements, soils, vegetation, water supplies, fences, walls, <br /> structures, existing sediment ponds, landscaping, etc. The CONTRACTOR shall repair and <br /> restore public or private property damaged during the work at his expense. The <br /> CONTRACTOR shall be fully responsible for any and all damage to property caused by his <br /> equipment or personnel. The CONTRACTOR shall ensure that the job site is restored to <br /> original or better condition and that the PROJECT MANAGER accept that the work is <br /> complete. <br /> 4 <br />