My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (168)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (168)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:19:06 AM
Creation date
10/18/2012 9:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seed Mixtures <br /> The CONTRACTOR is required to supply the seed, the seed mixture to be used shall be <br /> as specified in the Special Conditions: <br /> Mulching <br /> Hay or straw mulch shall be applied uniformly at the rate of two (2) tons per acre over <br /> seeded areas. Hydromulch shall be applied at the rate of one and a half (1 1/2) tons per <br /> acre. Mulch shall be applied to the designated areas immediately after seeding and not <br /> later than 24 hours after seeding has been performed. Mulching shall not be done when the <br /> wind velocity exceeds fifteen (15) miles per hour. <br /> Stabilizing Mulch <br /> On areas larger than one (1) acre a mulch crimper shall be used to stabilize or anchor the <br /> mulch into the soil after hay or straw mulch has been spread. The crimper shall be <br /> equipped with scrapers to keep the blades clean. Spacing of crimper blades shall not exceed <br /> nine inches (9") . On areas less than one acre crimping must be achieved by hand with a <br /> suitable tool, such as a spade, on 18" centers. <br /> Maintenance <br /> The CONTRACTOR shall maintain the areas until all work on the entire contract has been <br /> completed and accepted. Maintenance will consist of the repair of area damaged by <br /> erosion,wind, fire or other causes. Such areas shall be repaired to reestablish the condition <br /> and grade of seedbed and shall be refertilized, reseeded, remulched and/or reestablished <br /> as directed by the PROJECT MANAGER. <br /> 20.4 MEASUREMENT AND PAYMENT <br /> Revegetated areas will be measured to the nearest 0.1 acre and paid at the unit price bid <br /> for revegetation on the Bid Schedule. The price bid shall include all costs for labor, <br /> materials, equipment and all other items necessary for revegetation as described in these <br /> specifications. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.