My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (155)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (155)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:57:05 AM
Creation date
10/18/2012 9:48:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Basin Project Narrative <br /> Reclamation work will consist of minor runon structures to divert surface <br /> water flows from the upper coal flat and slope areas. Riprap lined runoff <br /> structures would be constructed to accommodate and direct flows off of the <br /> impacted areas and gulleyed downcast slopes and would be assimilated by the <br /> existing wetland area at the base of the eastern downslope area. An existing <br /> coal waste pile northeast of the eastern downslope area and immediately <br /> adjacent to Coal Creek would be regraded and partially relocated immediately <br /> to the south in an existing depression. Prior to grading, all existing <br /> topsoils will be stockpiled and redistributed after final grading. The upper <br /> coal flat would be regraded to promote revegetation success including contour <br /> furrowing and the selective handling of materials suitable for revegetation. <br /> Runoff from the upper coal flat area will be contained in dozer basins to <br /> likewise promote revegetative success. All disturbed areas will be seeded, <br /> mulched and crimped. Construction is scheduled to commence in July, 1991. <br />
The URL can be used to link to this page
Your browser does not support the video tag.