Laserfiche WebLink
STATE OF COLORADO <br /> MINED LAND RECLAMATION DIVISION of co <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 *+� o <br /> Denver,CO 80203 <br /> 303 866-3567 /876 <br /> FAX: 303 832-8106 <br /> Roy Romer, <br /> Governor <br /> Fred R.Banta, <br /> Division Director <br /> June 20, 1991 <br /> TO: ALL CONTRACTORS BIDDING ON THE COAL BASIN PROJECT RN-MINES-270 <br /> FROM: PAUL KRABACHER, PROJECT MANAGER <br /> RE: AMENDMENT No. 1 TO RN-MINES-270 <br /> Thank-you for your interest and attendance to the Coal Basin Project pre-bid <br /> meeting held yesterday. The following clarifications and amendments should be <br /> incorporated into the Invitation for Bid document: <br /> 1) A revised Bid Schedule is enclosed to be submitted with your bid and <br /> Amendment Acknowledgement sheet. Changes on the Bid Schedule include the <br /> following: <br /> a) The number of hours for the dozer time related to the coal <br /> waste pile relocation has been increased to 70 hours. <br /> b) The number of feet for Type A Channel construction has been <br /> increased to 2000 linear feet. <br /> c) Additional Item No. 7 includes 40 hours of a minimum 58 FHP <br /> backhoe/excavator for removing coal waste adjacent to Coal <br /> Creek. Please refer to the Equipment Rental section and <br /> related formula if a larger machine is to be used. <br /> d) Additional Item No. 8 includes the incorporation of 10 tons of <br /> native grown hay per acre by disking into the regraded coal <br /> bench area to a minimum depth of 6-8 inches. Three (3) acres <br /> will be treated as such. <br /> 2) The relocation of the power lines crossing the work area related to the <br /> coal waste pile relocation will be the responsibility of MLRD. <br /> Contractors will bid on work related to this area, referenced in Items 2, <br /> 6, and 7, assuming the lines will be relocated. The work related to Item <br /> 2 and 7, Coal Waste Relocation and Regrading and Excavator time, must <br /> include the cost for remobilization/redemobilizatin in the event that the <br /> power lines cannot be relocated prior to the completion of the other <br /> project phases and this phase is to be rescheduled. <br /> 3) The minimum FHP for the dozer work referenced under Item 2 and 4 will be <br /> 140 or a D-6D equivalent. For calculation and bidding purposes, the 70 <br /> hours will still be referenced to the 410 FHP/D-9 equivalent. If the <br /> contractor plans to furnish a machine other than the 410 FHP/D-9 <br /> equivalent, he must write the FHP of the machine under the bid item on the <br /> Bid Schedule, and adjust the unit price to insert in the Bid Schedule by <br /> doing the computations as explained under the Equipment Rental section. <br />